San Diego ADU rules for La Jolla
La Jolla is not a separate city. ADUs here are permitted by the City of San Diego under SDMC Chapter 14, Article 1, Division 3, summarized in City of San Diego Information Bulletin 400 (January 2026). What makes La Jolla different is the overlay map: much of the community is in the Coastal Overlay Zone, parts of it are in the Beach Impact Area of the Parking Impact Overlay Zone, and hillside parcels can be in a Very High Fire Hazard Severity Zone. This page sets out the citywide rules and flags where La Jolla's overlays change them.

First, which rules apply to your parcel
IB 400 carries an editor's note that matters more in La Jolla than almost anywhere else in the city. The Coastal Commission certified San Diego's Housing Action Package 1.0 ADU rules (O-21439) on September 12, 2024, so coastal ADU projects now follow those setback and landscape rules. But four later ordinances, O-21618, O-21758, O-21836 and O-21989, are not effective in the Coastal Overlay Zone until the Commission certifies them. Among the items not yet in effect on the coast:
- The accessible ADU home incentive program (Housing Action Package 2.0)
- The rule that a JADU may only be built within an existing or proposed single dwelling unit or an attached garage
- Setback flexibility for ADUs over 16 ft using base zone interior setbacks below 4 ft (2024 Land Development Code update)
- Adjustments to the ADU Home Density Bonus Program and alignment with state law (2025 amendments)
So the first step on any La Jolla ADU is to look up whether the parcel is in the Coastal Overlay Zone, using the city's Zoning and Parcel Information Portal.
How many units
| Lot type | Allowed |
|---|---|
| Single dwelling unit zone | 1 primary home + 1 attached or detached ADU + 1 converted ADU + 1 JADU |
| Multiple dwelling unit zone, existing multifamily | Conversions up to 25% of units + up to 8 detached ADUs (not more than existing units). No attached ADUs. See multifamily ADUs |
| Proposed multifamily | Up to 2 detached ADUs |
| Bonus program parcels | Up to 4, 5 or 6 ADUs + JADUs by lot size in single dwelling unit zones. See bonus program |
Guest quarters and non-habitable accessory structures are allowed in addition. ADUs proposed with a Senate Bill 9 urban lot split follow SDMC Chapter 14, Article 3, Division 13.
Size, height and setbacks
| ADU size | 150 to 1,200 sq ft; conversions of existing space not capped; 150 sq ft allowed for ingress/egress |
|---|---|
| FAR | ADU counts, but one ADU up to 800 sq ft is allowed regardless |
| Height | Base and overlay zone maximum; detached ADUs two stories max on single-unit-only lots |
| Front | Zone setback; one ADU of 800 sq ft or less may encroach |
| Street side | Zone setback or 4 ft, whichever is less |
| Interior side/rear | To property line subject to building code; 4 ft (or zone min) if over 16 ft next to residential; 4 ft in VHFHSZ |
| JADU | 150 to 500 sq ft, inside the house or attached garage, same setbacks as the house |
Details and diagrams: size, height and setbacks.
Parking
No parking is required for ADUs outside the Coastal Overlay Zone. Inside it, one space is required only within the Beach Impact Area of the Parking Impact Overlay Zone and outside a transit priority area, with exceptions. That combination is common in La Jolla. See beach-area parking.
Coastal Development Permit
Required in the Coastal Overlay Zone for ADUs and JADUs that aren't completely inside the existing primary structure, add habitable area, or convert non-habitable space. In the non-appealable area, it can be city-issued with the building permit through Process One. City CDP decisions on ADUs are not appealable to the Coastal Commission. See coastal permits.
Occupancy, rentals and sales
- No owner occupancy for ADUs. JADUs require it unless the JADU has separate sanitation.
- ADU leases must be at least 31 consecutive days.
- ADUs can be sold as condominiums under SDMC §141.0302(f). See rentals and condo sales.
Building code items
Sprinklers only if the primary home has them. Solar for new, non-manufactured detached ADUs. Building code fire separation can increase setbacks. Refuse and recycling storage must meet SDMC §142.0801.
Fees and how to apply
A building permit is always required. Apply online through the DSD portal (Building Applications, then Building Construction). Fees follow Information Bulletin 501; school fees, the General Plan Maintenance Fee and, where applicable, Development Impact Fees apply. See ADU fees and our plan check service. Under Gov. Code §66317, a complete application with an existing home on the lot must be approved or denied within 60 days.
Sources, checked Oct 14, 2026: City of San Diego Information Bulletin 400 (January 2026) · Gov. Code §66317.
Questions, answered
Who issues ADU permits in La Jolla?
The City of San Diego's Development Services Department. La Jolla is a community within the city, so San Diego's municipal code and Information Bulletin 400 govern.
How many ADUs can I build on a single-family lot in La Jolla?
One attached or detached ADU, one ADU converted from existing space, and one JADU, plus the main house. The Bonus program can allow more on qualifying parcels.
Do I need to live on the property?
Not for an ADU. A JADU requires owner occupancy unless it has its own sanitation facilities.
Can I rent my La Jolla ADU on Airbnb?
No. San Diego requires ADU leases of at least 31 consecutive days, and JADUs can't be used for short-term residential occupancy.