Addresses, Mail and Meters for a La Jolla ADU
A new La Jolla ADU needs an official address, a way for mail and deliveries to find it, and a decision about water and other meters. Here's how the City of San Diego handles each one, and the paperwork that makes them line up.
Published Nov 24, 2026
Addresses and meters feel like move-in details, but in La Jolla they get decided much earlier, during plan check. Get them right and the tenant's packages, the fire department and the utility bills all find the right door. Leave them vague and you can end up with a unit that works fine but confuses everyone who tries to reach it.
In the City of San Diego, plan check assigns it
La Jolla is part of the City of San Diego, so Development Services handles addressing. The City's Information Bulletin 185 explains that when a building permit has been submitted, addresses are assigned during the plan check process. For a new ADU going through a normal permit, you don't file a separate address request. The address comes out of the same review that checks your plans.
A small detail from the same bulletin: addresses ending in "00" aren't issued, because the City reserves them for official use. If you were hoping for a round number, it won't be that one.
Whether the unit ends up with its own street number or a unit number on the existing address is the City's call. Plan for either, and don't order signs, mailboxes or business cards for the ADU until the address is official.
Older and legalized units need a different route
Some La Jolla properties already have a second unit that was permitted years ago but never got a formal address. IB-185 has a verification requirement for exactly that case. The City will establish an official address for an already permitted structure, but you have to prove it's permitted. The bulletin accepts two documents: a valid building permit issued by the City, or the Assessor's Building Record for the property.
The request itself goes in digitally and includes the property's legal description, the assessor's parcel number, the addresses now in use, a short explanation, your contact information, and the building permit and plan file numbers if there's a recent permit. If you're going through unpermitted ADU legalization, expect the address to be part of that cleanup.
The one-page addressing diagram
Requests outside plan check need an addressing diagram on a single page. IB-185 lists what goes on it:
- existing buildings and their current addresses, including unit numbers
- the addresses of adjacent lots, even across a cross street
- the locations of front doors or main entrances
- any proposed buildings
- all property lines
- a north arrow
- the streets and nearest cross streets
The entrance locations matter more than people expect. The Address Coordinator is working out how someone standing on the street would find each door. An ADU entered from an alley, a side path or a lower street on a sloped lot may get handled differently from one whose door faces the same street as the house.
Numbers people can actually see
The 2025 California Residential Code sets the sign rules in Section R308. Buildings need approved address identification that's legible and visible from the street fronting the property, in characters that contrast with their background. Numbers must be Arabic numerals or letters, never spelled out, at least 4 inches tall with a half-inch stroke.
The rule that matters most for backyard units: where a building's address can't be seen from the public way, a monument, pole or other sign has to identify it. A detached ADU behind the main house, down a long driveway or on a flag lot often needs exactly that. The fire code official can also require the address in additional locations. Plan a lit sign at the point where the path to the ADU leaves the street.
How to write the mail
Once the address is official, mail and deliveries follow the Postal Service's addressing standards. USPS Publication 28 says secondary unit designators, such as APT or UNIT, are required on mail for addresses that have them, and the preferred spot is at the end of the delivery address line. Skip the pound sign if you know the right designator. If someone uses one anyway, the standard calls for a space between the pound sign and the number.
Give your tenant the exact format the City assigned, and use it on the lease. A consistent address from the first day saves a lot of misdelivered packages.
Water meters come up at submittal
The City's ADU bulletin, IB-400, lists the minimum submittal for each ADU or JADU. Alongside the site plan, floor plans, structural sheets and Title 24 energy calculations, the forms include a Water Meter Data Card. That means the water service question is part of your permit package from the start, not something to sort out after the walls are up.
Separate connections: what state law allows
State law draws a line between two kinds of ADU. According to the California Department of Housing and Community Development's ADU handbook, ADUs and JADUs created from existing space in the house or an existing accessory structure, under Government Code Section 66323(a)(1), can't be required to install a new or separate utility connection unless they're built at the same time as a new single-family home. For other ADUs, including most new detached units, a new or separate connection directly from the utility may be required.
So a garage conversion and a new backyard cottage can get different answers on the same lot. Our ADU utilities page goes through water, sewer and power capacity in more detail.
Shared or split meters for a rental
Even when a separate meter isn't required, some owners want one so a tenant can pay their own bills. Others prefer one shared meter and a rent that includes utilities. Either can work. A separate meter also makes it easier to tell whether a spike in usage, or a slow leak, belongs to the house or to the unit, which is handy on a property with irrigation on both sides. The choice affects how you write the lease, so decide it before you sign one. Our post on renting a La Jolla ADU covers the tenant side.
A sensible order of operations
- Settle where the ADU's entrance will be and how someone reaches it from the street.
- Decide on shared or separate utilities, and complete the water meter form with the permit submittal.
- Let plan check assign the address, and hold off on signs until it's official.
- Install address numbers that meet the code, plus a street-side sign if the unit can't be seen.
- Give the tenant the exact mailing format, unit designator included.
Working through it together
We work with verified contractors who build ADUs across La Jolla, and we treat addressing and utilities as part of the site plan rather than an afterthought. Ask for a Free Quote, and if you're still deciding where the entrance goes, our ADU permits page is a good place to start.
Sources (accessed Nov 24, 2026): Information Bulletin 185: How to Obtain an Address Change (City of San Diego Development Services) · Information Bulletin 400: Accessory Dwelling Units and Junior Accessory Dwelling Units (City of San Diego Development Services) · Accessory Dwelling Unit Handbook (March 2026) (California Department of Housing and Community Development) · 2025 California Residential Code, Section R308 Site Address (California Building Standards Commission (via GoCodebook)) · Publication 28, Section 213: Secondary Address Unit Designators (United States Postal Service)