(858) 758-8418Free Quote

The CalHFA ADU Grant: Status and What It Covered

The state's ADU grant round was fully allocated in December 2023. Its list of predevelopment costs is still a useful map of a La Jolla submittal, and two official scam warnings are worth keeping close.

Published Nov 19, 2026

Somewhere in a La Jolla inbox right now there's an old article about a state grant for ADUs. Sometimes it arrives as a newsletter link. Sometimes it's a stranger offering to help you apply. The program was real and it did useful work. What matters today is where it stands, what it was designed to pay for, and how to keep a well-meant search from turning into a costly mistake.

A notice dated December 28, 2023

The California Housing Finance Agency, known as CalHFA, ran the ADU Grant Program. The agency's program page still carries a short update dated December 28, 2023. It reads, in part: "The latest round of ADU funding has been fully allocated."

The state housing department's ADU Handbook, updated in March 2026, agrees. It says that at the time of writing the funds have been exhausted. Two state sources, one conclusion. As of November 2026 there isn't an open round to apply to.

Two warnings worth keeping side by side

CalHFA's same update adds a sentence every owner should read slowly. If anyone approaches you saying they can help you get an ADU grant, the agency calls it a financial scam and tells you not to contact them further.

La Jolla owners have a second warning to pair with it. The City of San Diego's ADU information bulletin, IB-400, currently opens with an alert: an active phishing scam is targeting permit applicants with fraudulent requests for permit payments. The City asks applicants to verify the sender's email address, or confirm with their department point of contact, before paying anything.

Put the two together and a simple rule emerges. No one can sell you access to a closed state grant, and no permit payment should go out on the strength of an unexpected email. Confirm through the agency directly, using contact details you looked up yourself.

What the grant was built to reimburse

The program reimbursed predevelopment and non-recurring closing costs tied to building an ADU. CalHFA lists the predevelopment side as site preparation, architectural designs, permits, soil tests, impact fees, property surveys and energy reports. HCD's handbook uses nearly the same list and adds that the grant served qualifying owners building on a lot with an owner-occupied single-family home.

That list has outlived the money. It's an honest inventory of what an ADU costs before construction starts, and it's the part of a budget owners tend to underestimate.

Lining that list up with a City of San Diego submittal

Because La Jolla is part of the City of San Diego, the City's bulletins set the paperwork. IB-400 lists the minimum submittal for each ADU or JADU. Matched against the old grant categories, it reads like a predevelopment checklist:

  • Site plan and vicinity map. Prepared under Information Bulletin 122. This is where property surveys and designer time land. IB-122 also strongly recommends getting a title report before site design, and warns that missing recorded easements lead to extra reviews, fees, construction changes and delays. Our journal entry on why a La Jolla ADU starts with a survey covers that step.
  • Floor plans, roof plans, elevations and sections. The architectural design category.
  • Structural plans, details and calculations, including truss calculations where they apply. Soils information often feeds these.
  • Title 24 energy calculations. The energy report category, by another name.
  • Forms. A general application, a water meter data card and a storm water applicability checklist.

IB-400 also describes a way to trim the design line. Under AB 1332, applicants may apply for a permit using preapproved ADU plans, and the bulletin notes that owners contact the plan's provider directly to learn what it cost of using that plan. A preapproved plan doesn't remove the site plan, the forms or any coastal review, but it can shrink the architectural portion of the early spending. The City keeps the list of preapproved plans on its ADU program page.

None of this is optional because the grant closed. It's simply the work every project pays for, grant or not. Our ADU fees page explains how the City's fees fit around it.

The coastal layer many La Jolla lots add

There's one more predevelopment item that's especially common here. IB-400 says a Coastal Development Permit is required in the Coastal Overlay Zone for ADUs and JADUs that aren't completely contained in the existing primary structure, that add habitable area, or that convert non-habitable space. It also notes that, since September 7, 2022, ADUs in the non-appealable part of the overlay zone can receive a City-issued coastal permit when specific findings show the project conforms to the Local Coastal Program.

That's design time, documentation and sometimes added studies. If your lot is near the coast, our coastal development permit page walks through what to expect.

Money that still exists, according to the state

HCD's handbook doesn't stop at the closed grant. It points out that some local agencies create their own funding for ADU predevelopment and construction, or waive fees. It lists state programs, such as CalHome and the Permanent Local Housing Allocation, that local agencies can use for ADUs. And it notes that federal and secondary-market lenders support ADUs: the Federal Housing Administration, Freddie Mac and Fannie Mae. HCD adds one detail worth flagging. The FHA's 203(k) rehabilitation loan can only be used to build an attached ADU.

HCD's ADU web page keeps a grants and funding section. That, and your lender, are the right places to check for anything new. Our ADU financing page covers how owners usually structure the build.

Keep a folder of early invoices

Whatever funding you end up using, it helps to keep every predevelopment invoice in one place: the survey, the title report, the designer, any soils work, the energy calculations and each City fee. Lenders reviewing a construction loan often ask what's already been spent. And if a new program ever does appear, whoever runs it will set its own rules on what counts, so clean records are simply good practice rather than a ticket to anything.

Before you pay anyone for "grant help"

A short checklist, built from the agencies' own words:

  1. The CalHFA grant round is fully allocated. There's nothing to apply to.
  2. CalHFA says anyone offering to help you get the grant is running a scam.
  3. The City of San Diego warns of fraudulent permit payment requests. Confirm every payment request directly.
  4. New funding, if it appears, will be announced by the agency offering it, not by a cold call.

How we help

We don't process grants, and we won't promise funding. We work with verified contractors who can scope your La Jolla lot and help you see the predevelopment costs clearly before you commit. When you're ready to plan with real numbers in hand, ask for a Free Quote.

Sources (accessed Nov 19, 2026): ADU Grant Program (California Housing Finance Agency) · Accessory Dwelling Unit Handbook (March 2026) (California Department of Housing and Community Development) · Information Bulletin 400, Accessory Dwelling Unit/Junior Accessory Dwelling Unit (August 2025) (City of San Diego, Development Services) · Information Bulletin 122, How to Prepare a Site Plan and Vicinity Map (May 2026) (City of San Diego, Development Services)