From Roof to Street: Where Water Goes on a La Jolla ADU Lot

A new ADU adds roof, and usually a path or a patio. Every square foot of it sheds water somewhere. Here's the route that water should take, and the City of San Diego rules that check your plan for it.

Published Nov 14, 2026

Pick a rainy afternoon, put on a jacket and stand in your yard. Watch where water leaves the roof, where it pools, and where it finally disappears. Doing this once, before the ADU is drawn, shows you more about the lot than a site plan will. La Jolla lots are full of quirks: slopes that tilt toward a neighbor, retaining walls, old drains that nobody has mapped. A new roof and a new path drop into that system and add to it.

The City of San Diego has rules for how that added water is handled. For most backyard ADUs they're not heavy, but they're real, and they appear on the plans. Here is the route water takes, step by step, with the rule that governs each stop.

Stop one: the roof and the downspout

An ADU roof sheds all of its water at the edges. The first design choice is where the gutters end and where the downspouts discharge. The worst version is a downspout that dumps beside the foundation. The California Building Code section on grading says the ground next to a foundation should slope away from the building, at least 5 percent for the first 10 feet. If you don't have 10 feet, the slope runs to an approved alternative drainage path.

That 5 percent figure is easy to remember: about six inches of drop over ten feet. It matters because soil settles after construction, and a flat spot against a wall becomes a place where water sits.

Stop two: the first few feet of ground

Paving gets its own rule. The same code section says impervious surfaces within 10 feet of the building, such as a concrete patio, should slope away at least 2 percent. A drainage swale within that distance has the same minimum.

This is the zone where small mistakes accumulate. A patio poured level, a planter box without drainage, and a path with a dip in the middle each hold water close to the new walls. When your designer draws the grading plan, these are the spots to check.

Stop three: spreading the water out

San Diego's stormwater approach is built on the idea that water should soak in or slow down before it reaches the street. All development projects must apply site design practices, according to the City's checklist for standard projects. The list includes:

  • Minimizing impervious area.
  • Minimizing soil compaction.
  • Dispersing impervious area runoff onto planted ground.
  • Landscaping with native or drought-tolerant species.
  • Maintaining natural drainage pathways.
  • Conserving existing soils and vegetation.
  • Collecting runoff, or harvesting and using rain.

Not every item applies to every project. The checklist asks you to mark each one as applied, not applicable, or not feasible. Any "not feasible" answer needs a written reason. Whichever practices you choose have to be shown on the construction plans, so they can't be a wish list.

"Dispersion" is the one most ADU lots use. The City's design manual describes it as directing runoff from rooftops, walkways and patios onto pervious ground, in an amount the ground can handle given its soil and slope. In practice that might mean a downspout that releases into a planted area instead of a pipe, or a path made of pavers set with gaps.

Stop four: what category is your project?

The City sorts projects using an applicability checklist. The categories that matter for a residential project are:

  1. Not subject to permanent stormwater requirements.
  2. Standard development project, where site design and source control practices apply.
  3. Priority development project exempt, where site design and source control still apply.
  4. Priority development project, which adds structural treatment requirements.

The thresholds for the highest category are large. A priority development project, for example, includes new development that creates 10,000 square feet or more of impervious surface. A typical ADU doesn't come close. That's why most are handled under the lighter standard-project approach. But the City makes the call based on the application, and special conditions such as sensitive areas can change the category. Your designer fills the checklist out, and the City reviews it.

Stop five: during construction

Construction itself is regulated separately. The City's checklist says all construction sites must put construction practices in place to keep sediment and pollutants out of the storm drain. Larger sites, generally those disturbing an acre or more, fall under a state permit. For smaller sites, the checklist says a minor water pollution control plan may be required when ground disturbance is under 5,000 square feet and the elevation change across the site is under 5 feet.

That is a good moment to think about your own yard. A trench, a stockpile of soil and a bare slope can all send mud to the street in the first storm. Your contractor should show where gravel bags, covers or fiber rolls go, and keep them maintained through the winter.

Property lines and neighbors

ADUs often sit close to a side or rear line. State law allows setbacks of up to four feet for new detached units, so roof edges and downspouts are near the boundary. Some questions to settle before you build:

  • Where does the water leaving your roof go if the downspout fails?
  • Does your grading push water toward a neighbor's wall or fence?
  • Is there a retaining wall, and does it have drainage behind it?
  • Are there existing drains or pipes on the lot that your trenching might cut?

These aren't legal questions so much as common-sense ones. They also have a practical side: a clean drainage plan reduces the odds of a plan-check comment and a dispute later.

Choosing the visible fixes

For most La Jolla ADU lots, the plan ends up as a handful of visible choices:

  • Downspouts that discharge onto planted ground or into a pipe leading to an approved outlet.
  • Patios and paths pitched away from the building.
  • Gravel or planted strips beside hardscape.
  • Smaller paved areas where a path doesn't need to be wide.
  • Plantings chosen with the landscape rules in mind. Our note on landscape water rules explains that side.

Our utilities page covers how water, sewer and other connections run to a new unit, and the detached ADU page explains how placement on the lot affects all of this. If you're planning to live in the main house during construction, the post on living at home during an ADU build covers the practical side of a work zone.

Putting it on the plan

Before the drawings go in, sketch your own version. Mark the roof edges, draw arrows for where each downspout would send water, and note any spot where the arrow ends against a wall or fence. Then compare it with the designer's grading plan.

We work with verified contractors who build drainage details into La Jolla ADU plans from the start. If you want a second set of eyes on how water moves across your lot, request a Free Quote consultation.

Sources (accessed Nov 16, 2026): Stormwater Standards Manual (August 2024 update) (City of San Diego) · Stormwater Requirements Applicability Checklist (Appendix E) (City of San Diego) · Stormwater Guidelines (City of San Diego, Development Services) · Section 1804, Excavation, Grading and Fill, California Building Code (International Code Council / State of California)